New Ozone, Oxygen & UV Systems: Design, Supply and Commissioning
For new projects and system replacements, we take you from the first assessment to a working, supported installation.
How a project runs
- 1Assess – understand the plant, water, flow, site constraints and objectives
- 2Size and select – process sizing and brand-independent equipment selection
- 3Supply – ozone, oxygen and UV equipment
- 4Install – procurement, installation and contractor coordination
- 5Commission – commissioning and performance verification
- 6Train and hand over – practical operator training
- 7Support – servicing, maintenance agreements and spare parts
Example project
UV disinfection
Staged UV System Replacement at an Aquatic Centre
A staged UV replacement that reduced disruption, avoided unnecessary pipework changes and improved local support. Existing plant: Dual Evoqua Barrier M UV units. Replacement: Australian-made Aqualec UV system.